Transportation Scenarios from the Proposed Budget

Part of the budget package that City Council had a hearing on last night is the restructured transportation funding, as listed in an attachment to the agenda called Transportation Scenarios Memo for TBD. The TBD is the Transportation Benefit District that allows us to collect additional sales tax and vehicle annual registration fees, so these scenarios show what is possible with various funding amounts.

The Transportation list of projects now includes five categories: Major Projects, Pedestrian and Bike Mobility, Vehicle Mobility, Neighborhood Mobility, and Preservation & Reconstruction. Normally these would have been the subject of a lengthy discussion at Transportation Commission, which would have then forwarded recommendations to the City Council for review and approval. Since that didn’t happen with the process this time, I’m scrambling a bit to understand the newly created list myself, and wanted to share the organization I’ve added in case it’s helpful to anyone else. Please also share with me any links and references you’re aware of. I’ll be adding more as I have time.

The next opportunity to learn more about the budget will be on September 30th, at the Budget Information Session at Bellevue CIty Hall, 6pm (link).

Neighborhood Mobility, 13-14% of overall investment. This list is from page 7 of the Transportation Scenarios memo, reorganized with numbering added so you can see where they originally appeared in the list.

1Parking and Curb Management Implementation (see Sept 14 newsletter comments on this)
21Project Development – Vision Zero
42Neighborhood Greenway Scoping and Implementation
48BellHop Interim Support
35Arterial Street Speed Mitigation Ph 1
12DT Bellevue Signal Safety Interventions
2164th Ave NE, Northup to NE 30th St Corridor Safety Improvements
4156th Ave NE, NE 8th to NE 24th St Corridor Safety Improvements (link)
15Project Development – Corridor Safety Improvements
41SE 8th St Corridor Safety Project Development
27NE 8th St/166th Ave NE Crosswalk Improvements
30Newport Way/4200 Block Crosswalk Improvements
39Somerset Dr Pedestrian Improvements
45NE 11th Place, 148th to 151st Ave NE Neighborhood Sidewalk
46156th Ave SE, Lake Hills Blvd to NE 1st Pl Multimodal Improvements
47164th Ave, SE 14th St to NE 6th St Multimodal Improvements
16Safe Routes to School – International School and Samm HS
17Safe Route to School – Newport HS
18Safe Route to School – SE 46th
19Safe Route to School – Main from 156th to 158th SW
33Safe Route to School – Allen Rd vic Newport Way
34Safe Route to School – Spot Projects (example?)
26108th Ave NE Street Lighting, Eastrail to City Limits
29Northup Way Street Lighting, WLSP to NE 8th St
49Lake Hills Neighborhood Street Lighting Improvements
3Safe Speeds Bellevue Citywide Arterial Speed Limit Reductions
6124th Ave SE north of Coal Creek Pkwy speed reduction
7Main St, 140th to 148th speed reduction
8Main St – 124th Ave NE south of NE 8th speed reduction
10116th Ave SE south of SE 60th St speed reduction
22SE 16th St, 145th to 148th Ave SE Speed Reduction
23Allen Rd Speed Reduction
24156th Ave, NE 4th St to SE 11th St speed reduction
37145th Place SE and Lake Hills Blvd Speed Reduction
43Lake Hills Blvd, 156th to 164th Ave SE Speed Reduction
44SE 35th Pl – SE 34th St, Eastgate Way to WLSP Speed Reduction
13High Injury Network Speed Feedback Signs
38Speed Feedback Signs at Speed Safety Camera Locations
202029-2030 Traffic Calming Overlay Coordination
5164th Pl SE – SE 38th St Traffic Calming
9SE 34th St – 113th Ave SE Traffic Calming
11161st Ave SE Traffic Calming
14166th Way SE & NE 28th St Traffic Calming
25173rd Ave NE n/o Northup Way Traffic Calming
28East Bellevue Greenway Traffic Calming
31151st Ave SE s/o SE 50th St Traffic Calming
32118th Ave SE n/o Eastrail Traffic Calming
36SE 8th St Traffic Calming
40146th Ave SE s/o SE 37th St Traffic Calming

Pedestrian and Bike Improvements, 28-29% of total

1Eastrail to Spring Blvd Trail Connection (link)
2Eastrail to Mountain to Sound Greenway Trail Connection (link)
14Pedestrian/Bike Eastrail Access from 118th Ave SE
12NE 12th, 100th to 108th Ave NE Multipurpose Path Completion*
18Eastrail Crossing Improvements at Lake WA Blvd
33114th Ave Multipurpose Path, NE 8th to SE 8th St Concept Design
36Eastrail Connection near Main St/116th Ave
132026 Citywide Pedestrian Facility Spot Improvements
27Main St at 101st Ave and 102nd Ave Pedestrian Improvements
3Eastgate Way near Richards Rd Sidewalk Completion
6SE 34th St, 162nd Pl SE to WLSP Sidewalk
7NE 40th St, 140th to 148th Ave NE Sidewalk (link)
8173rd Ave NE, Northup to City Limit Sidewalk
23SE 22nd St, 150th to 156th Ave SE Sidewalk
24SE 36th St, w/o 142nd Pl SE Sidewalk
28148th Pl SE, SE 44th St to SE 46th Pl Sidewalk
35Allen Rd, SE 38th St to 138th Ave NE Sidewalk
4NE 8th Street Complete Streets and Citywide High Visibility Crosswalks Projects (link)
15116th vic Overlake Hospital – Signalized X-walk
16NE Bellevue Crosswalk Improvements (NE 28th St/Bel-Red Rd, NE 24th St/171st Ave NE) (link)
17110th Ave NE/NE 2nd Pl & 164th Ave NE/NE 12th St Crosswalk Improvements
19NE 8th St near Vuecrest Crosswalk Improvements (link)
20132nd Ave NE near Bridle Trails Crosswalks and Speed Reduction
21NE 10th St/110th Ave NE Crosswalk Improvements
29NE 10th St/10700 Block Signalized Crosswalk
31156th Ave SE @ SE 10th St, SE 20th Pl, SE 22nd Pl and 157th Ave SE Crosswalks
34SE 60th St/120th Ave SE Crosswalk Improvements (link)
38Newport Way/129th Pl SE Signalized Crosswalk
5SE 16th St, 148 to 156th Ave SE Multimodal Improvements
22SE 8th St, 112th to Lake Hills Connector Multimodal Improvements
26Spring Blvd, 136th Pl NE to Bel-Red Rd Multimodal Improvements
30108th Ave NE, NE 4th to NE 8th St Multimodal Improvements
37Main St – 100th to 116th Multimodal Study
322028 Citywide Bicycle Facility Spot Improvements
9NE 2nd St, Bellevue Way to 108th Bicycle Improvements
10NE 4th and 120th Ave NE, 116th Ave NE to NE 8th Bicycle Improvements
11Northup Way, 120th to 124th Ave NE Bicycle Improvements
25Vertical Protection for Buffered Bike Lanes Demo

Vehicle Mobility (17-18% of total)

Smart Mobility Technology & Infrastructure (link)
Lk Hills Conn & SE 8th St Intersection Improvements
148th Ave SE/Kelsey Creek Center New Traffic Signal
W Lake Samm Pkwy/Northup Way New Traffic Signal
Project Development & Construction – Under performing i/s (?)
Forest Dr, SE 63rd to Lakemont City Services Communication
150th Ave SE/SE 37th St/I-90 EB Off-Ramp Interchange Improvements
Factoria Blvd/SE 38th St Intersection Improvements
148th Ave NE/NE 8th St Intersection Improvements
SE 8th St/114th Ave SE Intersection Improvements
Forest Dr/Lakemont Blvd, New Traffic Signal
NE 12th St/116th Ave NE Intersection Improvements
Newport Way/Lakemont Blvd Intersection Improvements

Major Projects (35-37% of total)

120th Avenue NE (Stage 4)https://bellevuewa.gov/city-government/departments/transportation/projects/belred-street-improvements/120th-avenue-ne-corridor
Bellevue College Connectionhttps://bellevuewa.gov/city-government/departments/transportation/projects/transportation-capital-projects/bellevue-college-connection
NE Spring Blvd (Zone 3) – 124th Ave to 130th Ave NEhttps://bellevuewa.gov/city-government/departments/transportation/projects/belred-street-improvements/ne-spring-blvd/ne-spring-blvd-124th-130th-ave-ne Also see (link), which describes the reasons this might not be good in the park.
MTSG – 142nd Place SE to 150th Avenue SE (Segment 3)https://bellevuewa.gov/city-government/departments/transportation/projects/capital-projects/mountains-to-sound-greenway-trail
W Lake Samm Pkwy Phase 3 Multimodal Improvementssee TFP-257
Transportation Master Plan(Might refer to the Transit Master Plan or the Transportation Facilities Plan?)
143rd Ave NE – NE 20th Pl, Bel-Red Rd to NE 20th Corridor Improvementssee TFP-291
W Lake Samm Pkwy Phase 4 Multimodal Improvementssee TFP-311

Preservation and Reconstruction, 6% of total

NE 20th St e/o 130th Ave NE Sidewalk Flood Mitigation
SE 36th Street Medians Modifications
Northup Way/116th Ave NE Traffic Signal Upgrade
Lake WA Blvd/NE 10th St Intersection Rebuild
School Zone Beacon Repair Citywide
Coal Creek Rockery Repair
Slope Stabilization Northup/NE 4th Pl, 130th/NE 26th Pl, 104th SE/SE 24th Pl
Major Sidewalk Repairs
112th Ave NE, NE 12th to NE 24th St Street Lighting Upgrades
NE 8th St/164th Ave NE Traffic Signal Upgrade
NE 8th St/92nd Ave NE Traffic Signal Upgrade
148th Ave SE – Larson Lake Flood Mitigation
Citywide Rockery Evaluation
Citywide Rockery Reconstruction

* This particular one is dismaying, since the current walkway on NE 12th in front of the townhomes between Bellevue Way and 106th is so lovely, and I think the tree tunnel will be hollowed out and trimmed back to widen it as a multipurpose path.

Comments

Leave a Reply

Your email address will not be published. Required fields are marked *